The complete guide to data warehouse migration cost

Data warehouse migration cost is set by four things: the size of the estate in objects, how complex the logic is, how much validation the result needs, and the pricing model you buy under. Data volume is not one of them. This guide explains each driver, gives price ranges by estate size, and shows how to build a budget for a SQL Server and SSIS estate that a finance team can check.

Short answer

How much does a data warehouse migration cost?

With Novuz, the conversion is a fixed price by component count and complexity, set by a $3,000 assessment. An SI-led rewrite of the same estate typically costs more; Novuz is about 40% cheaper.

EstateComponentsTypical durationTypical price
Smallunder 1,5005 to 6 weeks$25k to $40k
Medium1,500 to 5,0008 to 12 weeks$40k to $80k
Large5,000 to 10,00012 to 20 weeks$80k to $200k
X-Largeover 10,00020+ weeksfrom $200k

These are Novuz prices in USD, not industry averages. Industry averages mix estates and methods too different to compare.

Driver 1

How does estate size change the cost?

Count objects, not terabytes. An object is a table, view, stored procedure, function, ETL package, script or scheduled job. Each one has to be converted and proven, whatever the size of the data behind it.

Remove dead code before you count. Objects nothing calls should leave the scope, and that is the cheapest saving in any estate.

Driver 2

How does logic complexity change the cost?

BandWhat it looks likeEffect on cost
LowPlain views, single-statement procedures, simple loadsConverts by rule; little review
MediumCursors, temp tables, multi-step control flow, moderate dynamic SQLConverts by rule; more to reconcile
HighLong procedures with nested error handling, SSIS Script Tasks, dynamic SQL built at run time, hidden dependenciesNeeds engineer review and more test cases

The mix matters more than the total. Two estates of the same size can differ widely in price if one is mostly high-band.

Driver 3

How much does validation add?

Validation is often the largest hidden cost. If nobody can prove object by object that the new numbers match, both platforms run side by side until someone is confident. Each extra month is a month of two licenses and two teams.

Reconciling each object before cutover shortens the parallel run to the cutover window of each domain. That saving is usually larger than the conversion price difference between vendors.

Driver 4

How do pricing models change who pays for surprises?

ModelHow it is pricedWho pays if the estate is harder than expected
Free platform toolNo license feeYou do, in your team’s time finishing and testing
Hours (systems integrator)Time and materialsYou do; hours grow
Consumption or tokensPer run or per model tokenYou do; the total is open-ended
Fixed price per scopeSet from a full count before work startsThe vendor does, inside the agreed scope

Total cost

What does the total cost of a migration include?

Five lines. Most budgets miss the last two.

  1. Conversion: the price of converting and proving the logic.
  2. Your team’s time: decisions, reviews, functional testing and cutover.
  3. The new platform: consumption from the first cutover domain onward.
  4. The old platform, still running: license, support and infrastructure until each domain is cut over.
  5. Parallel running and validation: the months both systems run while someone proves the numbers match.

Worked method

How do you budget a SQL Server and SSIS migration?

  1. Count the stored procedures, functions, views, tables, SSIS packages and SQL Agent jobs.
  2. Flag the high-band objects: cursors, dynamic SQL, Script Tasks and linked servers.
  3. Remove the dead code, with evidence.
  4. Get a fixed conversion price from that count.
  5. Add the other four lines of total cost, with a cutover date for each domain.
  6. Compare the total with the cost of staying: license renewal, support and the team’s maintenance time.

FAQ

Frequently asked questions

How much does a data warehouse migration cost?

It depends on the number and complexity of the objects, not the data volume. With Novuz, an estate under 1,500 components typically costs $25,000 to $40,000 and one of 5,000 to 10,000 components $80,000 to $200,000, at a fixed price set by a $3,000 assessment. Add your team’s time, both platforms during the parallel run, and validation.

What drives data warehouse migration cost?

Four things: the number of objects, the complexity of the logic, the validation effort and the pricing model. Dead code, undocumented schedules and dynamic SQL push it up. Data volume affects data movement and run time, not the conversion price.

How much does a SQL Server and SSIS migration cost?

Count the procedures, packages and SQL Agent jobs first; the price follows that count and the share that is high complexity. Novuz fixes the price from a $3,000 assessment in three business days, and a First Domain of up to 1,500 components costs $25,000 to $40,000.

Why do data warehouse migrations run over budget?

Usually because the price was set before anyone counted the logic, and because the parallel run had no end date. Fix the conversion price after a full count, and reconcile each object so each domain can cut over on a date.

Is cloud data warehouse migration cheaper with a free converter?

The license is free, and for plain SQL it can be the cheapest route. The cost moves to your team: finishing what the tool could not convert, rebuilding schedules and proving the result. Price that work before comparing.

How we measure: Methodology

Written by Ted Ghose, Co-founder and CTO, Novuz

Last reviewed:

Find out what your logic debt is costing you.

Every object counted, lineage, dead code and a fixed price in three business days. $3,000, credited.

Take the logic debt scorecard

Not sure which door? The scorecard takes ten minutes and tells you.

Scorecard