Guide
The complete guide to data warehouse migration cost
Data warehouse migration cost is set by four things: the size of the estate in objects, how complex the logic is, how much validation the result needs, and the pricing model you buy under. Data volume is not one of them. This guide explains each driver, gives price ranges by estate size, and shows how to build a budget for a SQL Server and SSIS estate that a finance team can check.
Short answer
How much does a data warehouse migration cost?
With Novuz, the conversion is a fixed price by component count and complexity, set by a $3,000 assessment. An SI-led rewrite of the same estate typically costs more; Novuz is about 40% cheaper.
| Estate | Components | Typical duration | Typical price |
|---|---|---|---|
| Small | under 1,500 | 5 to 6 weeks | $25k to $40k |
| Medium | 1,500 to 5,000 | 8 to 12 weeks | $40k to $80k |
| Large | 5,000 to 10,000 | 12 to 20 weeks | $80k to $200k |
| X-Large | over 10,000 | 20+ weeks | from $200k |
These are Novuz prices in USD, not industry averages. Industry averages mix estates and methods too different to compare.
Driver 1
How does estate size change the cost?
Count objects, not terabytes. An object is a table, view, stored procedure, function, ETL package, script or scheduled job. Each one has to be converted and proven, whatever the size of the data behind it.
Remove dead code before you count. Objects nothing calls should leave the scope, and that is the cheapest saving in any estate.
Driver 2
How does logic complexity change the cost?
| Band | What it looks like | Effect on cost |
|---|---|---|
| Low | Plain views, single-statement procedures, simple loads | Converts by rule; little review |
| Medium | Cursors, temp tables, multi-step control flow, moderate dynamic SQL | Converts by rule; more to reconcile |
| High | Long procedures with nested error handling, SSIS Script Tasks, dynamic SQL built at run time, hidden dependencies | Needs engineer review and more test cases |
The mix matters more than the total. Two estates of the same size can differ widely in price if one is mostly high-band.
Driver 3
How much does validation add?
Validation is often the largest hidden cost. If nobody can prove object by object that the new numbers match, both platforms run side by side until someone is confident. Each extra month is a month of two licenses and two teams.
Reconciling each object before cutover shortens the parallel run to the cutover window of each domain. That saving is usually larger than the conversion price difference between vendors.
Driver 4
How do pricing models change who pays for surprises?
| Model | How it is priced | Who pays if the estate is harder than expected |
|---|---|---|
| Free platform tool | No license fee | You do, in your team’s time finishing and testing |
| Hours (systems integrator) | Time and materials | You do; hours grow |
| Consumption or tokens | Per run or per model token | You do; the total is open-ended |
| Fixed price per scope | Set from a full count before work starts | The vendor does, inside the agreed scope |
Total cost
What does the total cost of a migration include?
Five lines. Most budgets miss the last two.
- Conversion: the price of converting and proving the logic.
- Your team’s time: decisions, reviews, functional testing and cutover.
- The new platform: consumption from the first cutover domain onward.
- The old platform, still running: license, support and infrastructure until each domain is cut over.
- Parallel running and validation: the months both systems run while someone proves the numbers match.
Worked method
How do you budget a SQL Server and SSIS migration?
- Count the stored procedures, functions, views, tables, SSIS packages and SQL Agent jobs.
- Flag the high-band objects: cursors, dynamic SQL, Script Tasks and linked servers.
- Remove the dead code, with evidence.
- Get a fixed conversion price from that count.
- Add the other four lines of total cost, with a cutover date for each domain.
- Compare the total with the cost of staying: license renewal, support and the team’s maintenance time.
FAQ
Frequently asked questions
How much does a data warehouse migration cost?
It depends on the number and complexity of the objects, not the data volume. With Novuz, an estate under 1,500 components typically costs $25,000 to $40,000 and one of 5,000 to 10,000 components $80,000 to $200,000, at a fixed price set by a $3,000 assessment. Add your team’s time, both platforms during the parallel run, and validation.
What drives data warehouse migration cost?
Four things: the number of objects, the complexity of the logic, the validation effort and the pricing model. Dead code, undocumented schedules and dynamic SQL push it up. Data volume affects data movement and run time, not the conversion price.
How much does a SQL Server and SSIS migration cost?
Count the procedures, packages and SQL Agent jobs first; the price follows that count and the share that is high complexity. Novuz fixes the price from a $3,000 assessment in three business days, and a First Domain of up to 1,500 components costs $25,000 to $40,000.
Why do data warehouse migrations run over budget?
Usually because the price was set before anyone counted the logic, and because the parallel run had no end date. Fix the conversion price after a full count, and reconcile each object so each domain can cut over on a date.
Is cloud data warehouse migration cheaper with a free converter?
The license is free, and for plain SQL it can be the cheapest route. The cost moves to your team: finishing what the tool could not convert, rebuilding schedules and proving the result. Price that work before comparing.
Sources and further reading
- McKinsey & Company, "Tech debt: Reclaiming tech equity," October 2020: CIOs estimate tech debt at 20 to 40 percent of the value of their technology estate, and 60 percent say it has risen
- Gartner, Magic Quadrant for Technical Debt Management Tools, May 2026: by 2027, 80% of technical debt will be architectural
- Databricks Labs, Lakebridge: choosing the right tools
Written by Ted Ghose, Co-founder and CTO, Novuz
Last reviewed:
Find out what your logic debt is costing you.
Every object counted, lineage, dead code and a fixed price in three business days. $3,000, credited.
Not sure which door? The scorecard takes ten minutes and tells you.